Interfacility link cable – Comtech EF Data MIDAS Site Preparation Requirements User Manual

Page 20

Advertising
background image

Site Preparation Requirements, Operator’s Guide, Rev.2

Interfacility Link Cabling 3-2

The end of the conduit at the antenna location shall have a weather head
installed and sealed with a protective sealant to prevent moisture from entering
the conduit. The conduit shall be mounted in such a manner that the conduit
will be stabilized under severe weather conditions.

I

I

n

n

t

t

e

e

r

r

f

f

a

a

c

c

i

i

l

l

i

i

t

t

y

y

L

L

i

i

n

n

k

k

C

C

a

a

b

b

l

l

e

e

The IFL cables shall be pulled from the location of the outdoor equipment to
the inside of the equipment rack to be used for the Comtech EF Data supplied
equipment.

Advertising