Lna installation – Comtech EF Data XSAT-7080 User Manual
Page 104
Advertising

XSAT7080 X-Band Transceiver
Revision 0
5-25W Installation
MN/XSAT7080.IOM
A–22
A.5.5 LNA I
NSTALLATION
Figure A-21. Switch Port Locations
Step
Procedures
1
Remove all protective tape from switch and keep it clean.
2
Position Low Noise Amplifiers (LNAs) and gasket (4, Figure A-22) on Port 2
and Port 4 of switch (11).
3
Secure each LNA with eight bolts (8), lock washers (6) and flat washers (5).
4
Position waveguide termination (3) and gasket (4) on Port 3 and secure with
eight bolts (8), lock washers (6), and flat washers (5).
5
Position filter (10), gasket (4) and use eight bolts (8), lockwashers (6), and flat
washers (5) on remaining port.
Advertising