Flowserve CPM Series User Manual

Page 5

Advertising
background image

5

2.4 Install the pump back plate (seal chamber) and bolt it in place on

the bearing frame. See Figure 4.

Figure 4

Figure 5

Pump

Back

Plate

Bearing Frame

2.5 Position the CPM PX with the gland tight against the seal chamber

face. Turn the gland so that the flush tap is as close to the 12:00

o’clock position as possible and so that the flush piping will clear the

bearing frame. Tighten the gland nuts evenly in a diagonal

sequence. Do not overtighten the gland nuts, as this can warp seal

parts and cause leakage.

2.6 Assemble the pump. Avoid

pipe strain. Align coupling

properly.

2.7 With the impeller, shaft,

coupling, and bearings in

their final operating positions,

tighten the CPM PX drive

collar set screws.

See Figure 5.

Advertising