Commissioning, Wiring – Flowserve NRG 16-11 User Manual

Page 17

Advertising
background image

7

Apply mains voltage to level switch NRS -7.

Commissioning

Check whether the NRG …- and the associated controller NRS -7 are wired in accordance with

the wiring diagram.

Fig. 14, Fig. 15

Check wiring

Apply mains voltage

Wiring

– continued –

Tools

Screwdriver for cross-recess head screws, size 

Screwdriver for slotted screws, size .5, completely insulated according to DIN VDE 0680-

Open-end spanner A. F. 8 (9)

Voltage table

Use this voltage table as a reference when checking whether the level electrode is submerged or if

there is a malfunction. Please take the wiring diagram of the electrode NRS -7 into account.

Fig. 14, Fig. 15

Note

The self-checking routine of the amplifier NRS -7 reduces

U

-

every 40 seconds to

0 volt!

U

-

0 V

eff

0.5 µS/cm,

C=0.3 cm

-

 V

eff

0 µS/cm,

C=0.3 cm

-

U

-

U

-

submerged

exposed

malfunction (submerged/alarm)

U

-

2

<

U

-

2

U

-

Advertising
This manual is related to the following products: