Kammer control valves – Flowserve 025000 Series User Manual

Page 9

Advertising
background image

9

Flow Control Division

Kammer Control Valves

11.00

Hex bolt

Waisted bolt

Studs

Thread

DIN 933

DIN 2510

DIN 939

A2-70

1.7709

1.7258

CK 35

M 8

20 Nm

M 10

35 Nm

20 Nm

M 12

60 Nm

44 Nm 36 Nm

35 Nm

M 16

145 Nm

115 Nm 92 Nm

80 Nm

M 20

280 Nm

M 24

250 Nm

270 Nm

4.2.11 Using torque wrench, gradually tighten all bolts alter-

nating crosswise to following torques (see following
table).

Note: When the housing bolts are tightened, the halves
of the housing must always be parallel (see fig. 5).

4.2.12 Replace packing by inserting packing rings one at a

time tapping each one down with a suitable bushing.

IMPORTANT: ensure that the gaps in the packing
rings are distibuted evenly around the circumferance
in the packing box (gaps not in line).

Note:

different packings and fitting sequence is shown

in the spare parts list.

6.1.13 Insert packing follower. Fit gland nut for transport

purposes only. Gland nut to be fitted correctly and
tightened down when actuator is mounted.

4.2.14 When performing subsequent pressure test, note the

max. permissible pressure for the bellows. After the
check for leaks, close off test connection with plug or
suitable gauge.

Advertising