Commissioning, Wiring, Basic adjustments – Flowserve NRS1-9 User Manual

Page 11

Advertising
background image

11

Tools

Screwdriver for slotted screws, size 2.5, completely insulated according to
VDE 0680.

Commissioning

Check wiring

Check whether switching controller NRS 1-9 and the associated electrode
NRG 16-36 are wired in accordance with wiring diagram, fig. 1.

Apply power

Apply mains voltage. The green LED lights up, fig. 2.

6

Tools

Wiring

– continued –

Basic Adjustments

Change-over for sensitivity

The switching controller can be set to two different sensitivities. For this purpose a
code switch consisting of four individual switches is provided on the rear of the
controller.

Range 1: Sensitivity from 10

µ

S/cm (factory setting)

Range 2: Sensitivity from 0.5

µ

S/cm

1. Cut off power supply to switching controller.

2. Loosen cover screws and unplug cover from its base , fig. 1.

3. Move all four individual switches of the code switch to the desired range using

a small screwdriver, fig. 5.

Screwdriver for slotted screws, size 2.5, completely insulated according to
VDE 0680.

A

B

C

G

Advertising