Installation, Continued, Installing gas piping to fireplace location – Desa VSGF28NVA User Manual

Page 10: Installation items needed, Mantel clearances for built-in installation

Advertising
background image

107157-01F

10

For more information, visit www.desatech.com

For more information, visit www.desatech.com

13"

16"

19"

21"

2

1/2

"

6"

8"

10"

39

3

/

8

"

27

7

/

8

"

55

5

/

8

"

35

1

/

2

"

Installation Items Needed

Before installing fireplace, make sure you have the items listed
below.

• piping (check local codes)

• sealant (resistant to propane/LP gas)

• equipment shutoff valve *

• test gauge connection *

• sediment trap

• tee joint

• pipe wrench

* A CSA design-certified equipment shutoff valve with 1/8" NPT
tap is an acceptable alternative to test gauge connection. Purchase
the optional CSA design-certified equipment shutoff valve from
your dealer. See Accessories, pages 22 through 23.

WARNING: Never connect fireplace to private

(non-utility) gas wells. This gas is commonly known
as wellhead gas.

INSTALLATION

Continued

Mantel Clearances for Built-In Installation

If placing mantel above built-in fireplace, you must meet minimum
clearance between mantel shelf and top of fireplace opening.

If your installation does not meet the below minimum clearances,
you must:

• raise the mantel to an acceptable height,

OR

• remove the mantel.

Figure 14 - Rough Opening for Installing in Corner

Figure 15 - Attaching Fireplace to Wall Studs

Figure 16 - Minimum Mantel Clearances for Built-In Installation

Mantel
Shelf

Note:
All Vertical
measurements
are from top of
fireplace
opening to
bottom of
mantel shelf.

Nailing Flanges

Nails or
Wood
Screws

INSTALLING GAS PIPING TO FIREPLACE
LOCATION

WARNING: A qualified service person must con-

nect fireplace to gas supply. Follow all local codes.

WARNING: This appliance requires a 1/2" NPT

(National Pipe Thread) inlet connection to the pres-
sure regulator.

INSTALLATION

Built-In Fireplace Installation (Cont.)
Installing Gas Piping To Fireplace Location

3.

Install gas piping into fireplace location. This installation in-
cludes an approved flexible gas line (if allowed by local codes)
after the equipment shutoff valve. The flexible gas line must
be the last item installed on the gas piping. See Installing Gas
Piping to Fireplace Location
.

4.

Carefully set fireplace in front of rough opening with back of
fireplace inside wall opening.

5.

Carefully insert fireplace into rough opening.

6.

Attach flexible gas line to gas supply. See Connecting Fire-
place to Gas Supply,
page 11.

7.

Attach fireplace to wall studs using nails or wood screws
through holes in nailing flange (see Figure 15).

8.

Check all gas connections for leaks. See Checking Gas Con-
nections
, page 12.

9.

Plug electrical cord into electrical outlet installed in step 2,
page 9.

10. Install brass trim after final finishing and/or painting of wall

(see Figure 7, page 8).

Advertising