Legrand 291-H/BTC User Manual
Page 2
![background image](/files/794326/content/doc002.png)
Step 4. Tile Option.
For RC9CFFTC and RC9AFFTC, cut a clearance hole in tile floor
covering between 3 1/16" [78mm] and 4" [102mm] diameter.
NOTE: If installing poke-thru cover assembly over grout line on tile floor covering, apply a silicon bead to underside
of poke-thru flange or service head gasket.
Installing RC92GHBTC, RC91GHBTC, 291-H/BTC, and 292-H/BTC Style Service Heads:
Step 1. Install stem into core-drilled hole and then
Step 2. Attach base to poke-thru stem using
remove disposable plate. Retain the four
four #6-32 screws provided.
screws for use when installing service
head of choice.
CAUTION: Poke-thru stem cannot be rotated after insertion.
2
Cutout in Tile to be Between
3 1/16" [78mm] Min. Diameter
to 4" [102mm] Max. Diameter
Flange
RC91GHBTC, RC92GHBTC,
291-H/BTC, 292-H/BTC
Style Service Heads – Core
Drill a 3" Diameter Through
Both Tile and Concrete
3/4" [19.1mm]
Maximum
Tile Thickness
Factory Installed Gasket (Sets
on Top of Tile Floor Covering)
RC91GHBTC and 291-H/BTC
Carpet Covered Floor
Tile Covered Floor
RC92GHBTC and 292-H/BTC
Remove Disposable Plate
Push Down