Legrand RC3APTCBK User Manual

Page 4

Advertising
background image

Step 14. Attach slide cover with two #6-32 screws.

Step 15. Push Poke-Thru unit into concrete to

complete installation.

CAUTION: Do not over tighten cover mounting screws.

CAUTION: Poke-Thru cannot be rotated in hole after insertion into floor.

Step 16. Installation complete.

RC3 Poke-Thru Less Junction Box
Cat. Nos. RC3ATC-LJB, RC3ARTTC-LJB,
RC3ATCLJB25 and RC3ARTTCLJB25

(Applies to installations in the City of Chicago or
other locations where local codes require the use of
a communication adapter, EMT compression fittings,
and a junction box suitable for use in environmental
air spaces.)

Step 17. Follow steps 1 through 15 for installation.

4

Two #6-32
Slide Cover
Mounting Screws

Push Down

Attach COM75 Adapter

(Included with LJB Units) Per

Instructions Supplied with Unit

Once Poke-Thru is Pushed
into the Cored Hole, from
Below, Install a EMT
Compression Fitting (Not
Supplied) and Junction Box
(Not Supplied) to the Conduit
System. Complete Installation
Per NEC and Local Codes.

Advertising
This manual is related to the following products: