1 | head end equipment installation – Lencore Spectra i.Net: Installation and Operations Manual User Manual

Page 43

Advertising
background image

section 6

6.1 | head end equipment installation

HEAD END EQUIPMENT LIST:

•

i.LON®

•

Music and Paging Interface (optional)

•

SmartSwitch (optional)

•

Jordna Hub

•

FT Terminator (optional)

•

Mic Pre-Amp (Optional equipment)

•

320 watt, 48V Power supply

•

For SmartSwitch and first i.Net OP

•

For Mic Pre-Amp (optional)

Electrical Requirements:

One dedicated 120v/20 Amp circuit is suggested for the Lencore branded enclosure

Installing Head End Equipment (Din Rail and i.LON) (This may already be pre-wired)

2

1

WARNING

NOTE: Never use a ground lifter. Always use a proper three prong adapter for safety.

a

39

Advertising