Installation requirements, Electrical requirements, Gas supply requirements – Maytag MGDC415EW Dimension Guide User Manual

Page 2

Advertising
background image

ELECTRICAL REQUIREMENTS

A 120-volt, 60 Hz, AC-only, 15 or 20 amp fused electrical supply is required. A time-delay fuse or circuit breaker and a separate circuit

are recommended.

GAS SUPPLY REQUIREMENTS

Gas supply

:

This dryer is equipped for use with Natural gas. Dryer can be converted to L.P. gas. When rigid pipe is used it should be 1/2" IPS. When

acceptable to the gas supplier and local codes, 3/8" approved tubing may be used for lengths under 20 ft (6.1 m). For lengths over 20 ft (6.1 m), larger

tubing should be used. Pipe-joint compounds resistant to the action of L.P. gas must be used. An individual manual shutoff valve must be installed

within 6 ft (1.8 m) of the dryer in accordance with the National Fuel Gas Code ANSI Z223.1.

INSTALLATION REQUIREMENTS

Installation clearances:

The location must be large enough to allow the dryer door to

open fully.

Most installations require a minimum 5½" (140 mm) clearance

behind the dryer for the exhaust vent with elbow. See “Venting

Requirements.”

Installation spacing for recessed area or closet

The dimensions shown are for the minimum spacing allowed.

Additional spacing should be considered for ease of installation

and servicing.

Additional clearances might be required for wall, door, and floor

moldings.

Additional spacing of 1" (25 mm) on all sides of the dryer is

recommended to reduce noise transfer.

For closet installation, with a door, minimum ventilation

openings in the top and bottom of the door are required.

Louvered doors with equivalent ventilation openings are

acceptable.

Companion appliance spacing should also be considered.

Advertising