Venting requirements, Installation requirements, Vent system chart – Maytag NGD4700YQ Dimension Guide User Manual

Page 2: Vent system chart (29" wide long vent models only), Electrical requirements, Gas supply requirements, Water (steam models only) requirements

Advertising
background image

Because Whirlpool Corporation policy includes a continuous commitment to improve

Dimensions are for planning purposes only. For complete details, see Installation

our products, we reserve the right to change materials and specifications without notice.

Instructions packed with product. Specifications subject to change without notice.

ELECTRICAL REQUIREMENTS

VENTING REQUIREMENTS

E

xhaust venting: Exhaust your dryer to the outside. 4" (102 mm)

diameter vent is required. Rigid or flexible metal exhaust vent

must be used. Do not use plastic or metal foil vet. Exhaust hood

must be at least 12" (305 mm) from the ground or any object that

may be in the path of the exhaust.

Determine vent length and elbows needed for best

drying performance:

Use following Vent System Chart to determine type of vent

material and hood combinations acceptable to use.

NOTE: Do not use vent runs longer than those specified

in Vent System Chart. Exhaust systems longer than those

specified will:

Shorten life of dryer.

Reduce performance, resulting in longer drying times

and increased energy usage.

Louvered Hood

Angled Hood

Box Hood

Exhaust hoods:

Recommended Styles:

Acceptable Style:

The dryer must be connected to the cold water faucet using new inlet hoses. Do not use old hoses. Do not overtighten.

Damage to the coupling can result.

A 120-volt, 60 Hz, AC-only, 15 or 20 amp fused electrical supply is required. A time-delay fuse or circuit breaker and a separate circuit

are recommended.

GAS SUPPLY REQUIREMENTS

Gas supply

:

This dryer is equipped for use with Natural gas. Dryer can be converted to L.P. gas. When rigid pipe is used it should be 1/2" IPS. When

acceptable to the gas supplier and local codes, 3/8" approved tubing may be used for lengths under 20 ft (6.1 m). For lengths over 20 ft (6.1 m), larger

tubing should be used. Pipe-joint compounds resistant to the action of L.P. gas must be used. An individual manual shutoff valve must be installed

within 6 ft (1.8 m) of the dryer in accordance with the National Fuel Gas Code ANSI Z223.1.

WATER (STEAM MODELS ONLY) REQUIREMENTS

Determine vent path:

Select route that will provide straightest and most direct

path outdoors.

Plan installation to use fewest number of elbows and

turns.

When using elbows or making turns, allow as much

room

as possible.

Bend vent gradually to avoid kinking.

Use as few 90° turns as possible.

INSTALLATION REQUIREMENTS

Vent System Chart

Number of

90° turns or

elbows

Type

of vent

Box/louvered

hoods

Angled

hoods

1

4

3

2

0

Rigid metal

Rigid metal

Rigid metal

Rigid metal

Rigid metal

64 ft. (20 m)

54 ft. (16.5 m)

44 ft. (13.4 m)

35 ft. (10.7 m)

27 ft. (8.2 m)

58 ft. (17.7 m)

48 ft. (14.6 m)

38 ft. (11.6 m)

29 ft. (8.8 m)

21 ft. (6.4 m)

The “Vent System Chart” provides venting requirements that

will help achieve best drying performance.

NOTE: Side and bottom exhaust installations for 27" wide

models have a 90º turn inside the dryer. To determine

maximum exhaust length, add one 90º turn to the chart.

Vent System Chart

(29" Wide Long Vent Models Only)

Number of

90° turns

or elbows

Type

of vent

Box/louvered, or

Angled hoods

1

4

3

2

0

Rigid metal

120 ft. (36.6 m)

110 ft. (33.5 m)

100 ft. (30.5 m)

90 ft. (27.4 m)

80 ft. (24.4 m)

Rigid metal

Rigid metal

Rigid metal

Rigid metal

5

70 ft. (21.3 m)

Rigid metal

Advertising
This manual is related to the following products: