Battery and charging system – Paslode CF325Li Li-ion Cordless Framing User Manual

Page 8

Advertising
background image

8

Battery And Charging System

Charging Instructions:

1.

2.

NOTE

3. After charging, the red light will go out and the green

light will come on, indicating that the battery is fully
charged. The charger will keep the battery at full
charge until it is removed.

4. Unplug the wall transformer unit from the charger and

remove the wall transformer unit from the 120V AC
outlet.

Charging Times:

First charge (new battery)

1 hour

Discharged Battery

5 minutes to 1 hour

Charging Don'ts:

1. Never charge battery outdoors or in temperatures

below 40 F (5 C).

2. Never allow metal objects to come in contact with

battery terminals.

3. Never puncture or attempt to open battery case or

cells.

4. Never store battery where it will be subjected to

temperatures above 120 F (49 C).

5. Never incinerate battery.
6. Never use a defective battery charger, one that

overheats and/or smokes when plugged in.

7. Never immerse the battery in water.

Charging System Accessories:

Battery Charger Kit - Part No. 902667
Wall Mount Transformer - Part No. 902664
Battery Charger Base - Part No. 902658
Automotive Adapter - Part No. 902666

Charger
Base

THE PASLODE BATTERY CHARGING SYSTEM

Plug

Battery disposal:

The Paslode batteries contain lithium and should be
recycled or disposed of properly.

You may contact your local recycling center for information
on where to return the spent battery or call 1-800-822-8837
for information on Li-ion battery recycling in your area.

WARNING

CHEMICAL/EXPLOSION
HAZARD

Read ALL instructions before
charging or using battery.
Failure to follow ALL
instructions may result in fire,
severe burns, or release of
toxic materials.

Important Charging Notes:

Wall Transformer

Plug Receptacle

The Paslode Cordless

tool

comes with a rechargeable

Lithium Ion (Li-ion) battery and its own charging system.
This charging system is the

only one that will work with

Paslode Li-ion batteries. The first step in preparing a new
tool for operation is to fully charge the battery.

New batter-

ies are shipped partially discharged and must be
charged prior to first use.
Batteries will take 5 minutes to
1 hour (time will be dependant on the amount of discharge
within the battery) to recharge.

Remove the wall transformer from the tool case and
plug into a 120V AC outlet. Set the charger base on a
stable surface and insert the wall transformer unit's plug
into the plug receptacle on the bottom end of the char-
ger (see picture). A green light indicates power is on
and charging system is ready.

Remove the battery from tool or case and insert termi-
nals down into charger. The red light will come on
indicating that the battery is charging and the green light
will go out.

If battery is completely discharged the red light and
the green light may flash back and forth for up to 20
minutes. This safety feature slowly recharges the
battery until it is ready to accept the full charging
current. If the red and green lights continue to flash
after 20 minutes, replace the battery.

Advertising
This manual is related to the following products: