Installation and configuration, Prepare for installation, Physical connection overview – RLE 10K V.2.5.a User Manual

Page 13: Nstallation, Onfiguration

Advertising
background image

rletech.com

SeaHawk 10K User Guide

13

C

H A P T E R

C

HAPTER

0

I

NSTALLATION

AND

C

ONFIGURATION

2.1.

Prepare for Installation

To install the SeaHawk 10K, you’ll need following supplies:

Included with the SeaHawk 10K

♦

15 foot (4.57m) leader cable

♦

End-of-line terminator (EOL)

Available from RLE, sold separately

♦

12-24 VAC/VDC, 50-60Hz isolated power supply

♦

SeaHawk Sensing Cable, up to 10,000 feet (3048m)

♦

J-Clips

Available from other vendors

♦

Electrostatic discharge (ESD) protection

2.2.

Physical Connection Overview

The SeaHawk 10K contains two circuit boards:

♦

The top circuit board houses operational controls and displays. SeaHawk 10K operational

information is found in Chapter 3.

♦

The lower circuit board houses the connectors for:

–

AC/DC power

–

Earth ground

–

Relay output

–

Leak detection cable

–

Communications

Advertising