Installation, Start Up and Shut Down DF-745

17

4.1.4 Electrical Connections

Open the door and locate the power switch in the center of the upper rail. Be sure it is in
the OFF position. Plug the line cord (supplied with 110VAC units only) into the receptacle
at the back of the analyzer. Verify the operating voltage is proper according to the label on
the rear and connect the line cord to the power source. See Figure 6 and Figure 7.

4.1.5 Hydrogen Service Safety System

This optional system is designed to safeguard the DF-745 from explosion hazards when
operating on hydrogen sample gas under normal pressure and flow conditions as detailed in
the Operating Instruction Manual. The instrument chassis and the remote pump, if
equipped, are both protected by maintaining a safe condition within their respective
enclosures. If installed, this option impacts the electrical wiring, gas plumbing and operation
of the analyzer. See page 89 for additional installation and operation information.

NOTE, if equipped with the Hydrogen Safety Service System, when shipped from the
factory the analyzer will be configured through the GSF screen to measure hydrogen. As a
result, the Hydrogen Safety Service System will be enabled out of the box.

5

5

RLY4-COM

RLY2-COM

RLY1-COM

RLY1-NO

RLY1-NC

KEY

4

4

RLY3-NC

1

2

3

KEY

3

2

1

RLY3-COM

RLY3-NO

RLY2-NO

RLY2-NC

GND

8

6

7

GND

8

7

6

RLY4-NO

RLY4-NC

RX+

TX+

3

3

1

2

1

AC INLET

NOT USED

2

4-20mA-

4-20mA+

TX-

GND

RX-

KEY

8

7

6

4

5

KEY

GND

8

7

6

4

5

AOUT-

AOUT+

~

~

~

~

~

~

STANDARD GAS PANEL SHOWN

Figure 6: AC Power Connections