Pre-installation preparation, Clearances, Framing and finishing – Desa (V)VC42NE Series User Manual

Page 5: Continued

Advertising
background image

5

5

www.desatech.com

116237-01D

CLEARANCES

Minimum clearances to combustibles for the fireplace are as follows:

*Back and sides

0"/mm

Perpendicular walls

6" (152 mm)

Floor

0"/mm

Ceiling to louver opening 42" (1067 mm)

Front

36" (914 mm)

Top

0"/mm

Vent

(See venting instructions for

specific venting clearances.)

Combustible material with a maximum thickness of 5/8" may be

flush with the top front of fireplace.

* For back and sides of fireplace, do not pack with insulation or

other materials. Zero inch clearance to combustible materials are

for framing purpose only.

NOTICE: This fireplace is intended for use as supple-

mental heat. Use this fireplace along with your primary

heating system. Do not install this fireplace as your

primary heat source. If you have a central heating

system, you may run system’s circulating blower

while using fireplace. This will help circulate the heat

throughout the house. In the event of a power outage,

you can use this fireplace as a heat source.

FRAMING AND FINISHING

Figure 4 shows typical framing of this fireplace. Figure 5 shows fram-

ing for corner installation. All minimum clearances must be met.
For available accessories for this fireplace, see Accessories on page

34. If you are using a separate combustible mantel piece, refer to Fig-

ure 6 for proper installation height. You can install noncombustible

mantels at any height above the fireplace. Note: Noncombustible

mantels may discolor!

PRE-INSTALLATION

PREPARATION

Continued

Figure 4 - Framing Clearances for Installation Against an

Exterior Wall

C

B

A

D

E

F

G

Top of Louver Opening

3

2

1

4

5

6

7

Wall

Figure 5 - Framing Clearances for Corner Installation

Ref. Mantel Depth Ref.

Mantel from Top

of Louver Opening

1 14" (356 mm) A

16" (406 mm)

2 12" (305 mm) B

14" (356 mm)

3 10" (254 mm) C 12" (305 mm)
4 8" (203 mm) D 10" (254 mm)
5 6" (152 mm) E

8" (203 mm)

6 4" (101 mm) F

6" (152 mm)

7 2" (51 mm)

G 4" (101 mm)

Figure 6 - Clearances for Combustible Mantels

PRE-INSTALLATION PREPARATION

Clearances

Framing and Finishing

40

1

/

8

"

48

1

/

4

"

A

B

E

F

G

H

D

C

Nailing Tabs

8

48"

48

1

/

4

"

41

5

/

8

"

21

5

/

8

"

58

1

/

2

"

16

3

/

4

"

81

1

/

2

"

13

1

/

2

"

23" Horizontal Vent

26

1

/

2

" Vertical Vent

Advertising
This manual is related to the following products: