Installation, Continued – Desa (F)SVYD18N User Manual

Page 12

Advertising
background image

12

104461

VENT-FREE NATURAL GAS STOVE HEATER

DESA INTERNATIONAL

Tee Joint

Pipe
Nipple

Cap

3" Minimum

Sediment
Trap

Gas
Regulator

From Gas Meter
(5" W.C.** to 10.5"
W.C. Pressure)

CSA Design-Certified
Equipment Shutoff Valve
With 1/8" NPT Tap*

Approved Flexible Gas Hose
(if allowed by local codes)

Figure 21 - Gas Connection (SVYD18N and FSVYD18N Series)

* Purchase the optional CSA design-certified equipment shutoff valve from your dealer.

See Accessories, page 33.

** Minimum inlet pressure for purpose of input adjustment.

CAUTION: Use only new,

black iron or steel pipe. Inter-
nally-tinned copper tubing may
be used in certain areas. Check
your local codes. Use pipe of 1/2"
diameter or greater to allow
proper gas volume to heater. If
pipe is too small, undue loss of
volume will occur.

Installation must include a equipment shutoff
valve, union, and plugged 1/8" NPT tap.
Locate NPT tap within reach for test gauge
hook up. NPT tap must be upstream from
heater (see Figure 20, SVYD18NR and
FSVYD18NR series, or Figure 21,
SVYD18N and FSVYD18 series).

IMPORTANT:

Install equipment shutoff

valve in an accessible location. The equip-
ment shutoff valve is for turning on or
shutting off the gas to the appliances.

Check your building codes for any special
requirements for locating equipment shutoff
valve to fireplaces.

Apply pipe joint sealant lightly to male NPT
threads. This will prevent excess sealant
from going into pipe. Excess sealant in pipe
could result in clogged heater valves.

WARNING: Never connect

heater to private (non-utility) gas
wells. This gas is commonly
known as wellhead gas.

The gas inlet connection for the stove heater
is located on the lower right-hand side of the
stove when viewed from the front of the
unit. The gas connection can be made either
through the bottom right side or through the
lower back opening as illustrated in Figure
19. Make sure gas log heater is secured to
the stove cavity assembly.

CAUTION: Use pipe joint seal-

ant that is resistant to liquid pe-
troleum (LP) gas.

INSTALLATION

Continued

CONNECTING TO GAS
SUPPLY

WARNING: A qualified service

person must connect heater to
gas supply. Follow all local codes.

Installation Items Needed

Before installing heater, make sure you have
the items listed below.

• piping (check local codes)

• sealant (resistant to LP gas)

• equipment shutoff valve *

• test gauge connection *

• sediment trap

• tee joint

• pipe wrench

* A CSA design-certified equipment shutoff
valve with 1/8" NPT tap is an acceptable
alternative to test gauge connection. Pur-
chase the optional CSA design-certified
equipment shutoff valve from your dealer.
See Accessories, page 33.

Figure 19 - Gas Regulator Location and
Gas Line Access Into Stove Cabinet

Back Stove
Panel

Front of
Stove
Unit

Gas Inlet
Connection
Access

Product
Identification
Label

Gas
Log
Heater

Back View

Side View

Figure 20 - Gas Connection (SVYD18NR and FSVYD18NR Series)

3" Minimum

Sediment
Trap

Gas Control

From Gas Meter
(5" W.C.** to 10.5"
W.C. Pressure)

CSA Design-Certified
Equipment Shutoff Valve
With 1/8" NPT Tap*

Approved Flexible Gas Hose
(if allowed by local codes)

Tee Joint

Pipe Nipple

Cap

WARNING: This appliance re-

quires a 1/2" NPT (National Pipe
Thread) inlet connection to the
pressure regulator.

Advertising