Natural gas construction heater tc100rng, Storage, Operation – Desa TC100RNG User Manual

Page 4: Installation, Continued

Advertising
background image

4

104131

NATURAL GAS CONSTRUCTION HEATER

TC100RNG

TO STOP HEATER

1.

Close valve on gas supply.

2.

Turn control valve knob 1/4 turn to
right to PILOT position. Slightly push
in knob and turn 1/4 turn to right to OFF
position (see Figure 6).

STORAGE

1.

Place plastic cover cap over brass fit-
ting on inlet connector.

2.

Store in dry, clean, and safe place.

3.

When taking heater out of storage, al-
ways check inside of heater. Insects and
small animals may place foreign objects
in heater. Keep inside of heater free from
combustible and foreign objects.

CAUTION: Disconnect heater

from natural gas supply.

WARNING: Review and un-

derstand the warnings in the
Safety Information Section. They
are needed to safely operate this
heater. Follow all local codes
when using this heater.

WARNING: Never use an open

flame to check for a leak. Apply a
mixture of liquid soap and water
to all joints. Bubbles forming
show a leak that must be cor-
rected. Correct all leaks at once.

TO START HEATER

1.

Follow all installation, ventilation, and
safety information.

2.

Locate heater on stable and level sur-
face. Make sure strong drafts do not
blow on heater.

3.

Open gas supply slowly.

4.

Turn control valve knob 1/4 turn to left
to PILOT position (see Figure 3).

OPERATION

Figure 5 - Control Valve Knob and
Piezo Ignitor Button Locations

3.

Connect the hose to the heater at the 1/2
inch SAE flare fitting at the valve inlet.

Tighten all fittings with a wrench

4.

Open natural gas supply valve slowly.

5.

Check all connections for leaks.

6.

Close natural gas supply valve.

Control Valve Knob

Piezo
Ignitor
Button

INSTALLATION

Continued

5.

Push in and hold control valve knob
while pushing red piezo ignitor button.
Ignitor button may have to be pushed
again (3 to 8 times) until pilot lights.

Note:

Hose may be filled with air. If

so, allow 20 seconds for gas to reach
pilot before pushing ignitor button.

6.

After pilot lights, keep control valve
knob depressed for at least 30 seconds,
then release.

7.

If pilot light goes out, repeat steps 4
through 6.

8.

When pilot remains lit, start heater by
slowly turning control valve knob 1/4
turn to left to ON position (see Figure 4).

ON

FROM “PILOT” POSITION

SLIGHT PUSH TO

TURN OFF

FULL PUSH TO

LIGHT

OFF

PILOT

OFF

ON

Figure 3 - PILOT Position

PILOT

OFF

ON

ON

FROM

“PILOT

” POSITION

SLIGHT

PUSH

T

O

TURN OFF

FULL

PUSH

T

O

LIGHT

OFF

Figure 4 - ON Position

TO RESTART HEATER

1.

Wait five minutes after stopping heater.

2.

Restart heater by following steps un-
der “To Start Heater.”

Figure 6 - OFF Position

PILOT

OFF

ON

ON

FROM

“PILOT

” POSITION

SLIGHT

PUSH

T

O

TURN OFF

FULL

PUSH

T

O

LIGHT

OFF

Advertising