Watson-Marlow NBR User Manual

Page 11

Advertising
background image

10

important, refer to the drawings below for a proper hose
connection. The hose clamp should be installed against
the bracket E (example 1) or at the indicated position on
the bushing G (example 2).

Example 1 Hose connection (EHEDG) with a hose bore > 20mm.

A:

Pump hose

B:

Pump

C:

Detail Z (see detail image on page 12)

D:

Hose clamp

E:

Bracket

F:

Stainless steel insert

G:

Pipe flange

H:

O-ring

WARNING
Only use genuine Bredel parts for a proper
hose connection.

A

B

C D

E

H

G

F

Advertising