Installation & setup 4 – AEC OS Series Gravimetric Batch Blenders User Manual
Page 38

Page 37 of 118
Installation & Setup
4
4-1 Chapter Description and Objectives
It is the intent of this chapter to familiarize the reader with the proper site
requirements and installation procedures of the OS/OA blending system. The
information in this chapter is NOT meant to replace or supersede an established
local or company implemented procedures. It is meant to enhance them.
4-2 Site Requirements
This section describes site requirements in detail. These requirements are
broken down into mechanical mounting, electrical connections and pneumatic
connections. Since the OS/OA is available in several different mounting
arrangements, it is necessary for the reader to become familiar with the different
arrangements.
4-2-1 Mounting Configuration
The OS/OA System is available in (3) three basic mounting
arrangements. They are:
• Machine Mount
• Mezzanine Mount
• Floor Mount
4-2-1-1 Machine Mount
In a machine mounting application of the OS/OA unit, there are
a few items to review before placement and mounting of the
blending system begins.
First, verify the machine flange dimensions match the OS flange
(if the optional pre-drilled holes were ordered). The OS can also
be equipped with an optional cast throat section with a drain
port. This will bolt under the bottom plate of the blender.
Verify that the machine throat is physically capable of
supporting the OS/OA blending system with a full load of
material and vacuum loading equipment installed.
Important!
While in operation, the OS/OA applies horizontal and
vertical pressures to the mounting flange. If there is a
question as to the mechanical stability of a mounting
flange, contact AEC/HydReclaim’s Engineering department.