Operating instructions – Allmand Brothers Allmand 8.5 10 FT BACKHOE User Manual

Page 20

Advertising
background image

20

To check for pipeline leaks, start by digging a bellhole about six feet wide

and ten feet long. Then, dig lengthwise along the pipeline to locate the leak. Once
the leak is located, position the unit to dig at grade level on both sides of the pipe-
line. If a section of pipe is to be replaced, strip the soil from both ends of the
bellhole. Enlarge the hole enough to allow the workmen adequate working space in
the leak area.

DIGGING STRAIGHT WALL SHALLOW BASEMENTS

Begin at one corner, and remove as much material as possible to grade

level. Reset the unit forward and continue digging to the grade level. Progress
around the edge of the basement, finishing each corner as you come to it.

G

OPERATING INSTRUCTIONS

OPERATING TECHNIQUES

ATTACHMENT TYPE BACKHOES

PIPELINE LEAK REPAIR

Advertising