Checklist before installation – H3C Technologies H3C SecPath U200-A U200-M U200-S User Manual

Page 21

Advertising
background image

12

Rubber feet (supplied
with UTM device)

AC power cord (supplied
with UTM device)

M6 screw (user-supplied) Cage nuts (user-supplied)

ESD-preventive wrist
strap (user-supplied)

Cable tie (user-supplied)

Insulation sheath
(user-supplied)

Ring terminal
(user-supplied)

ESD-preventive gloves
(user-supplied)

Checklist before installation

Table 6 Checklist before installation

Item Requirements

Result

Installation site

Temperature

0°C to 45°C (32°F to 113°F)

Relative humidity 10% to 95% (noncondensing)

Cleanness

•

Dust concentration ≤ 3 × 10

4

particles/m

3

•

No dust on desk within three days

ESD prevention

•

The equipment and floor are well grounded.

•

The equipment room is dust-proof.

•

The humidity and temperature are at a proper

level.

•

Wear an ESD-preventive wrist strap and uniform

when touching a circuit board.

•

Place the removed interface module or CF card

on an antistatic workbench, with the face

upward, or put it into an antistatic bag.

•

Touch only the edges, instead of electronic

components when observing or moving a

removed interface module or CF card.

 

 

 

Advertising