NewsBrowse Installation and Configuration Guide
April 27, 2006
Chapter 2 Installing NewsBrowse
• Interconnect CoServer Link ports with cross-over cables.
• Connect power cables to a power supply.
Power supply units are hot-swappable.
To power up the HAFT platform, use the normal procedures for the Dell server and
log in to the Windows operating system as normal. The virtual server runs in a full
screen window. To get to the Dell server desktop, press
Ctrl + Shift + F12
.
To power down the HAFT platform, right-click the system tray icon and select
Manage Endurance Configuration | Shutdown
. This does an orderly shutdown of the
virtual server and the Dell server.
“Configure HAFT platform” on page 43
for network configuration
procedures.