Power, Table 26. performer-hd self-test – Grass Valley Performer-HD User Manual
Page 31

Performer-HD Instruction Manual
2-13
Power
Power
When setup, mounting, and cabling is complete, apply power to the system
to perform an operational check.
To power up and perform an operational check:
1.
Connect an AC cord to the
AC IN
connection on the back of the
Performer-HD.
2.
Connect the AC line cord from switcher to an AC main. Performer-HD
does a self-test.
Note
To accelerate the displays press any of the buttons 1 through 8 on the Perform-
er-HD front panel. To skip the self-test entirely press any other button.
Status information is displayed in the following order:
Table 2-6. Performer-HD Self-Test
Start-up Display
Protocol or Test
88 88 88
LED test
rE SE t
Warm reset
10 20
TEN-20 compatible
7 68 00
Baud rate
PA r n8
No parity / 8 data bits
SO 1- 10
No source offset
DE St 01
No destination offset
LV L1 23
No level offset
SL AV E0
Master mode
NT SC
NTSC video source