ShoreLand'r SLRB40TBBXLW V.2 User Manual
Page 3
Advertising
![background image](/files/817357/content/doc003.png)
Midwest Industries, Inc.
Ida Grove, IA 51445
800.859.3028
www.shorelandr.com
0003463
Page 3
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove
parts and sort by size.
RB Series
The RB -series rear bunk assembly is installed by
placing the bunk assembly mounting channel over
the rear crossmember and securing in place with a
1/2” x 4-1/4” hex bolt and lock nut. (See Diagram A).
Tighten only enough to hold in position until the boat
is placed on the trailer. Repeat on the other RB-bunk
assembly.
The short stabilizer bunk is installed to the adjustable
bunk bracket on the front cross member with a 3/8” x
1” hex bolt and lock nut. (See Diagram A, Detail B).
Advertising