ShoreLand'r SLXR34BXLW V.2 User Manual

Page 3

Advertising
background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003448

Page 3

FINAL ASSEMBLY INSTRUCTIONS

Remove the hardware bag from the frame, remove parts

and sort by size.

XR SERIES

The XR-series roller rack is installed by placing the roller

arm assembly mounting channel over the rear cross mem-

ber and securing in place with a 1/2” x 4-1/2” hex bolt and

lock nut. (See Diagram A). Note that it should be left loose

until the boat is placed on the trailer. Once the proper posi-

tions is determined, it may be tightened. Repeat on the other

roller arm assembly.

The short stabilizer bunk is installed to the adjustable bunk

bracket on the front cross member with a 3/8” x 1” hex bolt

and lock nut. (See Diagram A).

Advertising