Diagram d – ShoreLand'r PT2325AB User Manual

Page 6

Advertising
background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003964

Page 6

05/14/2008

SPRINGS

Position the axle under the frame so it is properly orientated. All

2” x 2” pontoon axles have holes drilled for mounting brake lines.

These attaching holes must be positioned to the rear of the trailer.

(If a brake axle is being installed, make sure axle is oriented so the

brake backup plates are on the right sides of the trailer. (Right on

right and left of left.)

Place the springs under the axle as shown so the closed eye of the

spring is to the front of the trailer. Drop two ½´x 2 9/16´x 5” square

U-bolts down around the axle and on each side of the spring as

shown.

Diagram D

Align the legs of the U-bolt with the holes in a spring pad and then

insert so the spring pad is up against the spring. Secure with ½”

flange lock nuts. Tighten to keep all items in position but do not se-

curely tighten until the axle assembly is completely installed under

the frame.

Advertising
This manual is related to the following products: