SMA ST6-US User Manual
Page 20

Attaching the conduits
SMA America, LLC
20
ST36-48US-IA-IUS112321
Installation Guide
2. Remove the six screws that secure the aluminum
sheets to the bottom of the Sunny Tower.
3. Store the aluminum sheets, mounting screws and
washers in a safe place.
4. Place the Sunny Tower with the openings above the
cable conduits onto the base.
5. Fasten the Sunny Tower to the base as described in
section 4.3 „Installing at the Location”.
6. Seal the Sunny Tower to the base.
7. Insert the cables into the Sunny Tower.
☑ The cables are inserted.
Without
aluminum
sheet.
• Seal the openings down to the base.
With aluminum
sheet.
• Punch holes for the conduits.
Figure to the right: Example for
plates with conduits.
A: Conduit for AC cables.
B: Conduit for communication
cables.
C: Conduit for DC cables.
• Insert the conduits into the openings.
• Attach the plate to the bottom of the Sunny Tower.
• Attach the screws and washers and tighten with a torque of 53 in-lbs (6 Nm).
• Attach the conduits with the appropriate hubs.