Step 1: cable preparation, 8micro motion t-series – Emerson Process Management MICRO MOTION T-SERIES User Manual

Page 12

Advertising
background image

Step 1: Cable preparation

Cable layout

Run conduit to

sensor

Metal conduit

Wrap the drain wires twice around the shield and cut off

the excess drain wires.

Micro Motion

cable gland

Pass the wires

through the gland

Cable glands

Remove the core processor

cover

Go to Step 2

Go to Step 3

Gland supplier

User-supplied

cable gland

Lay cable in conduit

Drain wires
wrapped around
shield

Gland type

Pass the wires through the gland nut and clamping insert.

Clamping
insert

Gland nut

1. Strip 4-1/2 inch (115 mm) of cable jacket.
2. Remove the clear wrap and filler material.
3. Strip all but 3/4 inch (19 mm) of shielding.

1. Strip 4-1/4 inch (108 mm) of cable jacket.
2. Remove the clear wrap and filler material.
3. Strip all but 1/2 inch (12 mm) of shielding.

NPT

M20

Wiring

8

Micro Motion T-Series

Advertising