Empire Comfort Systems DVP48FP7 User Manual

Page 25

Advertising
background image

Page 25

17375-10-0706

Figure 39

Figure 41

See Horizontal Termination Page 25 and Vertical Termination

Page 27-28.

NOTE: Termination cap should pass through the wall firestop

from the exterior of the building. Adjust the termination

cap to its final exterior position on the building.

Warning: Termination cap must be positioned so that arrow

is pointing up.

Attach the termination cap with the four wood screws provided.

Before attachment of the termination, run a bead of silicone sealant

rated above 250°F on its outside edge too, so as to make a seal

to the exterior wall.
NOTE: Wood screws can and should be replaced with appropriate

fasteners for use on stucco, brick, concrete or other types

of siding.

CAUTION: If exterior walls are finished with vinyl siding, (or

materials that could become discolored or warp) it is necessary

to install the vinyl siding standoff SD-1250.
Vinyl siding standoff SD-1250 will be installed between the vent

termination and the exterior wall. (See Figure 42) This horizontal

vent termination bolts onto the flat portion of the vinyl siding

standoff, so an air space will exist between the wall and the

termination cap.

Figure 40

Figure 42

FRAMING AND FINISHING (continued)

HORIZONTAL TERMINATION

Advertising
This manual is related to the following products: