Installation – Enviro 50-1574 User Manual

Page 14

Advertising
background image

�� �

�������� �������

�� ���� ����

���� �������

���� �������

�������� ���� �������

����������� ���

Installation

T

HROUGH

W

ALL

W

ITH

V

ERTICAL

R

ISE

AND

H

ORIZONTAL

T

ERMINATION

I

NSTALLATION

- R

ECOMMENDED

:

Figure 12: Venting horizontally with rise.

A 45° down elbow with a rodent screen

may be used in place of the termination

cap (or stainless steel termination hood).

T

HROUGH

C

ONCRETE

W

ALL

W

ITH

V

ERTICAL

R

ISE

I

NSTALLATIONS

:

Wall framing

Wall thimble

Termination cap

Vertical section

of vent pipe

Horizontal frame

for thimble

Clean out tee

90

o

elbow

EF 5

Concrete Wall

A 45° down elbow with a rodent screen

may be used in place of the termination cap

(or stainless steel termination hood).

Installation to use if there is a concrete or

retaining wall in line with exhaust vent on

pellet stove.

The termination must be 305mm (12”) from

the outside wall and 305mm (12”) above

the ground.

Figure 13: Venting with concrete wall behind unit .

14

• Follow vent manufacturer’s guidelines for installation of venting. High temperature sealant must be

used when connecting the vent pipe to the unit’s starter pipe. Improper seals at the vent joints may

cause combustion byproducts to leak into the room where installed - seal as required..

Advertising