17

ENVISION SERIES AIR HANDLER INSTALLATION MANUAL

Unit Start Up

Check that supply voltage matches nameplate data.

Fuses, breakers and wire size are correct.

Low voltage wiring is complete.

Piping is complete and water system is cleaned

and

flushed.

Air is purged from the closed loop system.

Isolation valves are open, water control valves or pumps

are

wired.

Condensate line is open and correctly pitched.

Transformer switched to 208v if applicable.

DIP switches are set correctly.

Blower rotates freely.

Blower speed is correct.

Air filter/cleaner is clean and in position.

Service/access panels are in place.

Return air temperature is between 50-80°F heating and

60-95°

cooling.

Check air coil cleanliness to insure optimum performance.

Clean as needed according to maintenance guidelines.

To obtain maximum performance the air coil should be

cleaned before startup. A 10 percent solution of

dishwasher detergent and water is recommended for

both sides of coil. A thorough water rinse should follow.

Maintenance Filters

Filters must be clean to obtain maximum performance.

They should be inspected monthly under normal operating

conditions and be replaced when necessary. Units should

never be operated without a filter. Always replace the filter

with the same type as originally furnished.

Condensate Drain

In areas where airborne bacteria produce slime in the drain

pan, it may be necessary to treat chemically to minimize the

problem. The condensate drain can pick up lint and dirt,

especially with dirty filters.

Blower Motors

The ECM motor is equipped with sealed ball bearings and

requires no periodic lubrication.

Air Coil

The air coil must be cleaned to obtain maximum perfor-

mance. Check once a year under normal operating condi-

tions and, if dirty, brush or vacuum clean. Care must be

taken not to damage the aluminum fins while cleaning.

Caution: Fin edges are sharp.