Technical Dept. - All rights reserved - Reproduction is prohibited
The product may be installed at the desired height, building a suitable platform on site. This support must be constructed in non-
flammable material.
The company disclaims all liability for any damage to objects and persons should the above-mentioned precautions not
be complied with.
PELLET LOADING CHUTE ASSEMBLY
Another choice to be made before placing the product is to define the side where to install the chute for loading the fuel. VIVO 90 PELLET
is delivered with two clamps, the connection pipe and the chute with hatch.
The chute may be mounted on the right side, on the left side or at the front. The connection pipe is 1 metre long.
It is obligatory to shorten the connection pipe, depending on positioning (side or front), so that it is properly taut
and at a minimum angle with respect to the horizontal. This operation is required for pellet descent.
Before installing the cladding perform a fuel loading test to ensure it descends correctly towards the hopper.
It is obligatory to provide for correct insulation of the pipe in case it is fitted on the left side where the smoke exhaust
is.
The manufacturer disclaims all liability in the event of failure to comply with the above warning.
Fire hazard!!
D = SUPPORT
E = OPTIONAL PLATFORM OR BUILT ON SITE
B = SCREW
C = FRAME