MCZ Gaugin User Manual

Page 12

Advertising
background image

INSTALLATION AND USE MANUAL

Chapter 3

GAUGUIN

page

12

Chapter 3

Technical service – all rights reserved by mcz spa

Reproduction prohibited

3.6. PHASE 4– ASSEMBLY OF SLATE FRAME WITH STAINLESS STEEL FIRE BOX


Insert the stainless steel fire box (6) in the slate frame (5), lowering it enough that the holes of the fire bed are

concentric with those of the slate frame. Add two brackets (7), ensuring that the fire bed rests on the brackets.

Fasten the three elements (slate frame, fire bed and bracket) using 2 screws M5X50 w/flange (which pass

through from the back to the front side), secured with two flanged nuts FD M5.

LATO A VISTA

Advertising