Three phase version – Riello UPS Sentinel Dual (High Power) (3.3 - 10 kVA) User Manual

Page 66

Advertising
background image

66

U

SE

Three phase version

1. (8-10kVA THREE PHASE VERSION): Use 3 cables with 6

mm

2

section (EARTH, L2 and L3) and 2 with 10 mm

2

section (N, L1) in input (N.B.: L1 and N have a greater
section because in operation from bypass they have to carry
all the input current)
. For the output use 3 cables with 10
mm

2

section (EARTH, N and L). With reference to the figure

shown at the side:

- Insert the cables from the 63A magneto-thermal switch into

seal stop P2 (input line).

- Insert the cables from the load into seal stop P1 (output line).

- Strip the cables observing the measurements provided.

- Insert the part that has just been stripped into the ferrules

provided.

(6,5kVA THREE PHASE VERSION): Use 3 cables with 4
mm

2

section (EARTH, L2 and L3) and 2 with 6 mm

2

section

(N, L1) in input (N.B.: L1 and N have a greater section
because in operation from bypass they have to carry all the
input current)
. For the output use 3 cables with 6 mm

2

section (EARTH, N and L). With reference to the figure
shown at the side:

- Insert the cables from the 63A magneto-thermal switch into

seal stop P2 (input line).

- Insert the cables from the load into seal stop P1 (output line).

- Strip the cables observing the measurements provided.

- Insert the part that has just been stripped into the ferrules

provided.

2. Connect the wires to the relative terminals strictly

following the instructions set out below:

Input line

a - Ensure that the magneto-thermal switch upstream

is open.

b - Connect the earth wire to terminal 5.

c - Connect the neutral wire to terminal 1.

d - Connect the phase wires to terminals 2, 3 and 4
(use the red wire for L1).

Output line

a - Connect the earth wire to terminal 6.

b - Connect the neutral wire to terminal 7.

c - Connect the phase wire to terminal 8.

Bypass line

a - Ensure that a jumper is connected at terminals 9

and 10; this is needed for the correct operation of
the UPS.

3.

Secure the cable guides to the flange, close the drawer and secure it with the screw removed previously.

Advertising