2 planned failover in windows server 2008 r2 – Avago Technologies Syncro CS 9286-8e User Manual
Page 61

Avago Technologies
- 61 -
Syncro CS 9286-8e Solution User Guide
November 2014
Chapter 4: System Administration
Understanding Failover Operations
4.2.1.2
Planned Failover in Windows Server 2008 R2
Follow these steps to perform a planned failover on a Syncro CS 9286-8e system running Windows Server 2008 R2.
1.
Create a backup of the data on the Syncro CS 9286-8e system.
2.
Open the Failover Cluster Manager, as shown in the following figure.
Figure
42 Failover Cluster Manager
3.
In the left panel, expand the tree to display the disks, as shown in the following figure.
Figure
43
Expand
Tree
4.
Right-click on the entry in the Assigned To column in the center panel of the window.
5.
On the pop-up menu, select Move > Select Node, as shown in the following figure.
6.
Select the node for the planned failover.