B. install fireplace & chimney, C. install chase top – Hearth and Home Technologies BAY-40 User Manual

Page 33

Advertising
background image

33

Slope Downward
(1/4 in. per foot
minimum)

Turn-down

Drip Edge

Chase

2 in. (51 mm) Collar
on Chase Top

.018 (26 ga) min.
Galvanized
Chase Top

Figure 9.3 Chase Top Construction

B. Install Fireplace & Chimney

Install as per Sections 7 and 8.

Heat & Glo • BAY-40, PIER-40 • 34977 • Rev W • 11/08

C. Install Chase Top

• You MUST use a chase top in a chase installation. Chase

tops are available from your Heat & Glo dealer or may
be fi eld constructed.

• Include a turndown and drip edge to prevent water from

seeping into the chase.

• Include a 2 in. (51 mm) soldered, caulked or spun collar

around pipe opening to keep water out.

• Provide a 1/8 in. (3 mm) gap around the fl ue pipe.
• Slope the chase top downward away from the

opening.

CAUTION! DO NOT caulk the pipe to the chase top
collar.

• Caulk all seams to prevent leaks.
• Refer to Figure 9.4.

Advertising