Belt routing and adjustment – HONDA Quicksilver 54 User Manual
Page 9
Advertising
BELT ROUTING AND ADJUSTMENT
1. The spring end-to-end length is set at 5-1/4” from the factory. The spring length
MUST BE checked after running 15 minutes and again after mowing for an
hour. Check spring length again after a few hours of mowing. After the belt is
‘RUN-IN’, the correct spring length is 4-3/4”-5”. Measurements are taken from
the spring ends. See picture below.
Measure total spring length
from end to end
Replacement Belt: PUR1546
9
Advertising