Havis-Shields C-VS-800-CV User Manual

Page 3

Advertising
background image

C-VS-800-CV_INST_9-07

3

Remove wire plug going to

Ashtray/Power point frame

assembly

Power point detached from

assembly

Drill out spot-welds that hold the

power point bracket to the frame. This

needs to be removed in order for the

console to slide into the rail

Ashtray frame rail re-assembled

Slide console into ashtray

frame slide rails

Re-install ashtray frame bracket

Re-route HVAC controller and the

AM/FM radio harness and antenna

to the VS console

It is necessary to notch the OEM

ashtray/power point frame assembly if

relocating the HVAC controls to the VS

console. This will allow the HVAC

vacuum hoses to reach the VS console

Notch

Note: If NOT relocating

AM/FM radio and/or

HVAC controls, resume

installation at this point

Advertising