Hubbell Electric Heater Company EMV User Manual

Page 18

Advertising
background image

IMMERSION THERMOSTAT

1. Disconnect power from unit.
2. Remove access cover and locate thermostat.
3. Remove high limit cover screw and cover.

Cover

Cover Screw

4. Disconnect the two (2) 14 gauge wires.

Wires

Capillary Tube

5. Remove capillary tube and bulb from

.

thermowell.

6. Remove two (2) mounting screws.

Mounting Screws

7. Replace thermostat using reverse procedure. (Note: Be

sure to place capillary tube into slot in base prior to
installing cover.)

18

Advertising