G. Install Firestops

For Horizontal Runs - Firestops are REQUIRED on both

sides of a combustible wall through which the flue passes.
To install firestops (heat shield) for horizontal runs that pass

through either interior or exterior walls:
• Cut a 10 in. by 12 in. (254 mm X 305 mm) hole through

the wall.

• Position the firestops on both sides of the hole previously

cut and secure the firestops with nails or screws.

• The pipe opening of the firestops

MUST BE placed

towards the bottom of the firestop.

• Continue the flue run through the firestop.

Figure 10.13 Flue Pipe & Firestop

CEILING

NEW

FRAMING

MEMBERS

EXISTING CEILING

JOISTS

CHIMNEY

HOLE

A

B

Figure 10.14 Hole and New Framing Members

Figure 10.12 Installing Support Brackets

F. Install Support Brackets

For Horizontal Runs - The flue system must be supported

every 5 ft. (1.52 m) of horizontal run by a horizontal pipe

support. To install support brackets for horizontal runs:
• Place the pipe supports around the flue pipe.
• Nail the pipe supports to the framing members.
For Vertical Runs - The flue system must be supported

every 8 ft. (2.44 m) above the heater flue outlet by wall

brackets. To install support brackets for vertical runs:
• Attach wall brackets to the flue pipe and secure the wall

bracket to the framing members with nails or screws.

For Vertical Runs - One firestop is REQUIRED at the hole

in each ceiling through which the flue passes.
To install firestops for vertical runs that pass through

ceilings:
• Position a plumb bob directly over the center of the

vertical flue component.

• Mark the ceiling to establish the centerpoint of the flue.
• Drill a hole or drive a nail through this center point.
• Check the floor above for any obstructions, such as

wiring or plumbing runs.

• Reposition the heater and flue system, if necessary, to

accommodate the ceiling joists and/or obstructions.

• Cut a 10 in. x 10 in. (254 mm x 254 mm) hole through

the ceiling when using DVP pipe, and a 9 in. x 9 in.

(229 mm x 229 mm) hole when using SLP pipe. Use

the firestop pipe opening as a guide.

• Frame the hole with framing lumber the same size as

the ceiling joists.

WALL BRACKET

WALL STUD

2.44 m

FLUE

OUTLET

25 mm

A

B

SLP

9 in.

(229 mm)

9 in.

(229 mm)

DVP

10 in.

(254 mm)

10 in.

(254 mm)