Torage – HONDA Insight User Manual

Page 16

Advertising
background image

16

L

ONG

-T

ERM

S

TORAGE

In addition to a conventional 12V battery, the Insight has a

. When the vehicle is

stored for a long period, the IMA battery will gradually discharge and must be charged periodically (ideally

once every three months). To maintain the IMA battery, follow this procedure:

1.

Remove the 40A EPS Fuse (No. 15) from the Under-Hood Fuse box in the engine compartment,

then start the engine. The EPS warning light on the dashboard will illuminate because the EPS

fuse is missing. This does not indicate a system fault. The warning light will go off when the

EPS fuse is refitted.

2.

Make sure the area around the vehicle is free of flammable items. Then, run the engine at 3500

rpm for 5-10 minutes. Monitor the IMA Battery Level Gauge for movement indicating its

charging process.

3.

The procedure is complete when the IMA Battery Level Gauge shows fully charged.

4.

Reinstall the 40A EPS Fuse in its original position (No. 15).

Advertising