Installation procedure – haier AB482XCAAA AB242XCAAA User Manual

Page 30

Advertising
background image

(2) Check if water drainage is smooth after installation.

Charge, through air outlet or inspecting hole, 1200ccd water to see water drainage.

After wiring

Remove cover of control box, short connect "CHECK" terminal of the indoor unit, which is on the uper
part of indoor unit PCB. Connect 1PH power to terminal 1 and 2 on terminal block.
Note, in this operation, fan will be running.
Upon confirmation of a smooth water drainage, be sure to cut off power supply
and remove short connection of "CHECK" terminal.

Check water drainage in cooling operation.

28

Method of water charging

Charge water from
air outlet

Charge water from
inspecting hole

Watering can of plastic
pipe should be about
100 mm long

100mm

Water drainage port for
maintenance

(Drain water from
this hole)

Self-provided stiff pipe

Maintenance

Inspecting hole

Cover of controll box

PCB on

indoor unit

Terminal block

When wiring is not complete

Installation Procedure

Advertising