Setting your schedule, Scheduling – Hunter Fan 44372 User Manual

Page 14

Advertising
background image

44040-01 • 05/11/2010

14

5

Scheduling

Setting Your Schedule

1. Press the

Schedule

Button to enter Scheduling mode.

2. Use the or buttons to select “On” and then

Next

to move forward to Scheduling.

Note: If you do not wish to use the scheduling option on your thermostat, refer to page 22, step 2.

3. Monday will be flashing on the screen, to proceed with scheduling, press

Next

. If you wish

to start programming another day, press the or button until it shows at the top of the

screen and press

Next

.

4. By default “Away” will be flashing on screen to start your scheduling. Use the

Next

button to

proceed to the next step.

5. Use the or buttons to adjust the start time on the left of the screen for the period and

press

Next

. Again you will use the or buttons to adjust the end time on the right of the

screen for this scheduled period. Press

Next

again.

Advertising
This manual is related to the following products: