Scheduling – Hunter Fan 44372 User Manual

Page 18

Advertising
background image

44040-01 • 05/11/2010

18

5

Scheduling

Setting Your Schedule

10. The day select screen will now show “Copy Day” and ask you if you wish to copy the day

you just scheduled to any other days. Select “YES” and

Next

or see step 13 for selecting

“NO”.

11. Select each day you wish to copy the schedule to by using the or buttons to turn days

on or off and the

Next

or

Back

buttons to scroll through the days.

An arrow above each

day will indicate it has been selected.

Note: The original day you schedule will not show on the screen as it is the one being

copied.

12. Select

Done/

Home

and the screen will show the days that now have the same schedule

and flash “COPIED”. You will be taken back to the day select screen to schedule

your remaining days. Repeat steps 3-12 to finish scheduling.

Note: If you select “NO” and then

Next

you will be asked to select the next day to

schedule, bypassing the “Copy” function. Repeat steps 3-11 for each day you

wish to schedule seperately.

13. When all days have been scheduled, whether using the copy function or not, the

screen will flash “Schedule Updated!” along with all the days, and eturn you to the

home screen.

Note: To go back and edit schedules, you will follow the same process as outlined

above.

Advertising
This manual is related to the following products: