Warning / caution – Hubbell Electric Heater Company CE110 User Manual

Page 14

Advertising
background image

SECTION V

- SERVICING & REPLACEMENT OF PARTS

WARNING / CAUTION


Before servicing or replacing any part make sure to turn the power supply switch to the OFF
position.

SURFACE TEMPERATURE HIGH LIMIT CUT-OFF

1. Disconnect power from unit.
2. Remove access cover.
3. Disconnect the four (4) 14 gauge wires.





Control Wires




4. Remove the two (2) mounting screws.







5. Replace control and install new high limit switch by performing above steps in reverse

order; refer to wiring diagram in Section II. Torque screws per chart in back


HEATING ELEMENT

1. Disconnect power from unit.
2. Shut off incoming water supply.
3. Attach hose to drain connection.
4. Lift manual release lever on relief valve to let air into system or break union on

outgoing water line.

5. Drain water from tank.
6. Remove access cover.
7. Disconnect the wires from the heating element terminals.


Thermowell







Wires


Mounting Screws

14

Advertising