Service and adjustments – Husqvarna DRT900E User Manual

Page 16

Advertising
background image

16

SERVICE AND ADJUSTMENTS

CABLE CLIP

SCREW

DRIVE

CONTROL

CABLE

EXTENSION

SPRING

ENGINE

PULLEY

IDLER

PULLEY

TRANS MIS SION

PULLEY

LESS

TEN SION

5/8"

MORE

TEN SION

Fig. 26

TO REPLACE GROUND DRIVE BELT

(See Figs. 25 and 26)

Remove belt guard as described in “TO REMOVE BELT

GUARD”.

Remove old belt by slipping off engine pulley first then

remove from transmission pulley.

• Place new belt in groove of transmission pulley and

into engine pulley. BELT MUST BE IN GROOVE ON

TOP OF IDLER PULLEY. NOTE POSITION OF BELT

TO GUIDES.

• Check belt adjustment as described below.
• Replace belt guard.
• Reposition wheel and replace clevis pin and hairpin

clip.

GROUND DRIVE BELT ADJUSTMENT ( S e e

Fig. 26)

For proper belt tension, the extension spring should have

about 5/8 inch (16 mm) stretch when drive control bar is

in “EN GAGED” position. This tension can be attained as

fol lows:
• Loosen cable clip screw securing the drive control

cable.

• Slide cable forward for less tension and rearward for

more tension until about 5/8 inch (16 mm) stretch is

obtained while the drive control bar is engaged.

• Tighten cable clip screw securely.

Advertising