Caution, D. installing adaptor and termination cap, Masonry factory built wood burning – Hearth and Home Technologies FB-ZC-S User Manual

Page 15

Advertising
background image

Heat & Glo • FB-ZC-S • 2019-910 Rev. G • 11/08

15

D. Installing Adaptor and Termination Cap

To install adaptor see Figure 7.3.

CLASS A PIPE

Figure 7.3

Damper Flashing Kit (Optional)

For use with LINK-DV4-30B Liner Kit.

Note: Damper may have to be removed to use this kit.

• Run fl ex liners through 3” holes in damper fl ashing.

• Attach damper fl ashing to fi rebox roof with self tapping

screws included in kit.

Figure 7.4

To help eliminate cold air drafts, it may be necessary to
place non-combustible insulation around the fl ues as they
go though the damper.

Note: The LINK-DV4-30B system REQUIRES this
insulation.

Masonry

Factory Built

Wood Burning

EXHAUST

AIR

VENT PIPE

TERMINATION

CAP

LINK-DV30B

Installation

LINK-DV4-30B

Installation

INLET AIR

VENT PIPE

WARNING:

DO NOT BLOCK

THIS PIPE END!

EXHAUST

AIR

VENT PIPE

INLET AIR

VENT PIPE

Note: Untwist
the pipe while
extending it, to
achieve full 30’
length.

Remove 18 inch x 18 inch fl ashing on cap by removing
3 screws. Connect both the LINK-ZC-ADPB to Class
A Pipe and the termination cap to the LINK-ZC-ADPB
with the self tapping screws provided.

OPTIONAL LINK-ZC-ADPB

FOR USE WITH CLASS A

WOODBURNING PIPE

OR

CAUTION

Sharp Edges
• Wear protective gloves and safety

glasses during installation.

Advertising