Important, Side view – Huffy Sports Basketball Systems User Manual

Page 11

Advertising
background image

02/04

P/N 21145507

11

1" (2.54 cm)

5.

Note A

Make a reference mark

here for anti-skid tape.

Note B

Keep flange pushed down

to concrete and leveled.

Tamp down concrete to release air pockets and build drainage hill. Level pole
section in all directions several times while concrete is curing.

After concrete has cured, remove bottom pole section from ground sleeve (4). Place
anti-skid tape (6) around the bottom area of bottom pole (see note A).

6

4

6.

5

IMPORTANT!:

WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP. CONCRETE MUST CURE.

Note A

Place top edge of anti-skid

tape on mark made in step 5.

Note B

Tape prevents the pole

from rotating during play.

1" (2.54 cm)

SIDE VIEW

Advertising