Tct375 terra cotta cap – Heatiator Heatilator Wood Burning Fireplace CL36D User Manual

Page 34

Advertising
background image

34

Heatilator • CL36D, CR36D • 12538 • Rev Z 7/12

Storm

Collar

Chimney

Pipe

Chase Top

Termination

Cap

Chase

14 1/2 in. (368 mm)

Maximum

Collar

2 in. (51 mm)

Minimum Height

Caulk gaps between

storm collar & pipe,

and storm collar

& chase top.

Do NOT

block air

holes

3 clip brackets.

Slip over chase collar

and attach with screws

provided.

Termination cap pipe and chimney section must overlap 1-1/2 in. (38 mm)

Assemble

storm collar

around extended

termination cap

pipe

once cap is

installed.

Figure 9.5 Installing a TR342 Round Telescoping Termination

Cap

Chimney

Pipe

Chase Top

Termination Cap

Chase

Collar

2 in. (51 mm)

Minimum Height

Place waterproof

caulk or sealer under

each flange of the

termination cap and

on top of each screw

to help prevent leaks.

Flange

Termination cap pipe and chimney section must overlap 1-1/2 in. (38 mm)

2 in. (51 mm)

maximum

4 3/4 in. (121 mm)

maximum

The last section of pipe

must stop between 2 in. (51

mm) above the top of the

chase and 4 3/4 in. (121

mm) below the top of the

chase.

Figure 9.6 Installing an ST375 Square Termination Cap

• ST375 Square Termination Cap

• TR342 Round Telescoping Termination Cap

Chimney

Pipe

Chase Top

Termination Cap

Chase

Collar

2 in. (51 mm)

Minimum Height

Termination cap pipe and chimney section must overlap 1-1/2 in. (38 mm).

Place waterproof sealer under

each flange of the termination

cap and on top of each screw

to help prevent leaks.

2 in. (51 mm)

maximum

4 3/4 in. (121 mm)

maximum

The last section of pipe must

stop between 2 in. (51 mm)

above the top of the chase and

4 3/4 in. (121 mm) below the

top of the chase.

Figure 9.7 Installing a TS345/TS345P Square Termination Cap

• TS345/TS345P Square Termination Cap

Chimney

Pipe

Chase Top

Termination Cap

Chase

Collar

2 in. (51 mm)

Minimum Height

Remove 2 screws

from front & back

to lift the top off

Termination cap pipe and chimney section must overlap

1-1/2 in. (38 mm)

Place waterproof sealer

under each flange of the

termination cap and on

top of each screw to

help prevent leaks.

The last section of pipe

must stop between 2 in.

(51 mm) above top of

chase and 7 in. (178 mm)

below top of chase

2 in. (51 mm)

7 in. (178 mm)

Figure 9.8 Installing a TCT375 Terra Cotta Cap

• TCT375 Terra Cotta Cap

Advertising